- Thread starter
- #7,001
Yep good point, this too.Each turbine requiring roads to be gouged throughout pristine national parks, 50-100m wide in some points. All that crushed rock quarried and transported in from hundreds of km away...
First 150m turbine installed a few hours from me got wrapped around a jarrah trying to turn into the property lol.





