Frustrated Tiger
Premium Platinum
She's an old boiler.....Mel Doyle ?![]()
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.

LIVE: St Kilda v Hawthorn - Rd 12 - 7:30PM Thu
Squiggle tips Hawks at 66% chance -- What's your tip? -- Injury Lists » -- All Rd 12 Games
She's an old boiler.....Mel Doyle ?![]()
Never said i wouldn't.....You'd still have a go though

you would be surprised. The non light box big ones are bloody expensive, and take time to make. Don't know the details (not an engineer), but I think its because they are all custom designs that weigh a tonne. So not only are you dealing with all components being individually made, it has to be strong enough to not fall on your head while downing pots.
Log in to remove this Banner Ad
They don't take 6 months. If it's illuminated the time is probably more in the approvals time.
They weigh less than you would expect. It's probably an aluminium frame with a printed vinyl face. They have to find a place to put it on the facade though, a freestanding sign is much more expensive as it requires more strength.
- Concept design: 2 weeks
- Engineering design / certification: 1-2 weeks
- Approvals process: 6 weeks +
- Fabrication: 6 weeks (more or less depending on manufacturers schedule)
- Installation: 2-3 weeks depending on getting power to the sign location

Very true.....maybe people power will get us a sign.....At least the old building had the this is Tigerland sign. This one has nothing
Weekend holiday edition old mate, all young chicks off the rookie list by the look....no idea who they areMel Doyle ?![]()
They don't take 6 months. If it's illuminated the time is probably more in the approvals time.
They weigh less than you would expect. It's probably an aluminium frame with a printed vinyl face. They have to find a place to put it on the facade though, a freestanding sign is much more expensive as it requires more strength.
- Concept design: 2 weeks
- Engineering design / certification: 1-2 weeks
- Approvals process: 6 weeks +
- Fabrication: 6 weeks (more or less depending on manufacturers schedule)
- Installation: 2-3 weeks depending on getting power to the sign location
RFC_Official we really want this ! Our club is not me bank FC it's Richmond and we want a giant logo illuminated sign on our headquarters

i can actually see us finishing 14th and haveing a better yr than this yr with much improvement.
I wonder who the ex-Richmond board poster, would have just said this on the main board?![]()

Yes FatherCan I suggest you place him on your ignore list, in isolation it looks like a silly statement but if you read his posts in that thread in full, nothing wrong with what he said.

Who said it, ya know its always fascinated me that there are rfc posters that rarely comment on this board in favour of oppsition, bay13 or main boardI wonder who the ex-Richmond board poster, would have just said this on the main board?![]()
Well it wasnt the Easter BunnyWho said it, ya know its always fascinated me that there are rfc posters that rarely comment on this board in favour of oppsition, bay13 or main board

Aha..lightweight that wouldnt see more than a game a year, i care little for the opinion of his typeWell it wasnt the Easter Bunny![]()
because they are banned from this boardWho said it, ya know its always fascinated me that there are rfc posters that rarely comment on this board in favour of oppsition, bay13 or main board
Their are 2 or 3 other very good posters who wouldnt be banned here.because they are banned from this board