is it going to remain Thebarton Oval or are they likely to sell out and make it something stupid like OTR Arena or something just as heinous?
We’d be mad if we didn’t monetise it. No way we forego $ to protect the hallowed ‘Thebarton Oval’.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.

Due to a number of factors, support for the current BigFooty mobile app has been discontinued. Your BigFooty login will no longer work on the Tapatalk or the BigFooty App - which is based on Tapatalk.
Apologies for any inconvenience. We will try to find a replacement.
is it going to remain Thebarton Oval or are they likely to sell out and make it something stupid like OTR Arena or something just as heinous?
We’d be mad if we didn’t monetise it. No way we forego $ to protect the hallowed ‘Thebarton Oval’.
I drive past there from time to time. Am I correct in observing that the development of South Road there is happening simultaneously?
Are they launching the northern one from that intersection?The third TBM is undergoing factory trials ahead of shipping early next year, so the construction precinct where it will be assembled, housed, and then set off from needs to be ready for it by then.
The parts for the second TBM just arrived, and they'll be moved to Clovelly Park where it and the first TBM will be assembled and housed in that enormous steel frame warehouse being built roughly where the Tonsley Hotel used to be.
All systems go, as they'll be boring the southern and northern tunnels at the same time starting the second half of next year (only one machine for the north, as the tunnels are only half as long so it will be spun around to do both in the same time as each long one is done simultaneously in the south)
Log in to remove this Banner Ad
I assumed the big shed was for the precast concrete for the tunnel lining?The third TBM is undergoing factory trials ahead of shipping early next year, so the construction precinct where it will be assembled, housed, and then set off from needs to be ready for it by then.
The parts for the second TBM just arrived, and they'll be moved to Clovelly Park where it and the first TBM will be assembled and housed in that enormous steel frame warehouse being built roughly where the Tonsley Hotel used to be.
All systems go, as they'll be boring the southern and northern tunnels at the same time starting the second half of next year (only one machine for the north, as the tunnels are only half as long so it will be spun around to do both in the same time as each long one is done simultaneously in the south)
Are they launching the northern one from that intersection?
Also where did you get this level of detail?
www.t2d.sa.gov.au
I assumed the big shed was for the precast concrete for the tunnel lining?
Actually I reckon I remember someone on one of the Facebook posts saying it will be a spoil storage shed.Good point, also could be both. I only drive past and back one day a fortnight and am usually too busy keeping my distance from peanuts and making sure I don't clip any misplaced cones, I'll see if I can get a better look at some point. Tis a mighty tall warehouse though.