They had no issues with the previous NBN....
i.e They don't want Fraudband.
Ah ... they didn't sign the deal because of the performance of the "previous NBN".
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.

They had no issues with the previous NBN....
i.e They don't want Fraudband.
They had no issues with the previous NBN....
However, iiNet says it is refusing to sign up because NBN regularly meets less than 80 per cent of its new connection commitments to iiNet customers.
Having been an iinet customer twice in the last decade, they are not immune to screwing things up on their own. They're good, but not perfect.iiNet thinks the NBN are arse clowns
http://www.abc.net.au/news/2014-01-17/iinet-rejects-nbn-broadband-agreement/5204784
Log in to remove this Banner Ad
No they didn't sign because under MT's new NBN agreement iiNet would have to cover Customer any Service Guarantee payments and any charges for failures for faults which NBN co maybe responsible for.Ah ... they didn't sign the deal because of the performance of the "previous NBN".
http://www.ibtimes.com/south-korea-...ll-be-1k-times-faster-existing-speeds-allow-1South Korea Will Invest $1.5B On Building A 5G Network That Will Be 1K Times Faster Than Existing Speeds And Allow 1-Second Movie Downloads
...
The speed on the current 4G network in the country is 75 megabits per second, or Mbps, according to ZDNet. The 5G network will allow users to download an 800-megabyte movie file in one second, compared with the 40 seconds it takes under 4G, media reports said, citing the science ministry.
'Fastest ever' broadband speeds achieved in fibre test
The "fastest ever" broadband speeds have been achieved in a test that hit 1.4 terabits per second – enough to transmit 44 high-definition movies in just one second.
British Telecom (BT) and French networking equipment company Alcatel-Lucent conducted the test on the existing fibre network in London, with the hope of maximising the efficiency of the current infrastructure and avoiding costly upgrades.
http://www.theage.com.au/it-pro/bus...ds-achieved-in-fibre-test-20140123-hv9lf.html
Just leave this here, shall I?
However, it is important to note the test was conducted on the backhaul, or core, network and does not equate to the speeds users would receive at home.
You are correct, we would need to have ubiquitous FTTP connection to get anywhere near achieving that translation to connection speed between each other in the future.....So applicable to both FTTP and FTTN. But I guess you already knew that.
You are correct, we would need to have ubiquitous FTTP connection to get anywhere near achieving that translation to connection speed between each other in the future.....
When asked by iTWire about the disparity between the Coalition’s $90 billion estimate of a FTTP network and the much lower NBN Co estimate (made by the management team the Coalition had put into place) of $56 billion, the best Fletcher could say was that the Coalition estimate “may have been a little high.”
Lied whilst in opposition, well I never.http://www.itwire.com/it-policy-news/govenrment-tech-policy/63161-maybe-we-did-overestimate-labor’s-nbn-cost-admits-government
Is this the first admission from the Government that they lied while in opposition?
I saw that, it was good, he spent most of the time piling shit on Labor while at the same time praising the QA and stimulus packages that were used overseas during the GFC, these seem to be good if used anywhere but Australia. I think Joe is getting a but confused, but my he's good at platitudes.Just Heard Joe Hockey Press conference saying Australia governments must invest in its inter-structure, Pity that does not seem to be the case with the NBN. The majority of Australian will be left with a compromised FTTN using a degrading cooper network.
Would have thought this was important infrastructure Joe?.
No, he's not confused.
He just knows that most Australian media are too lazy to care.
NBN chairman Ziggy Switkowski said the rollout in Tasmania would begin using the existing copper network and that the fibre-to-the-premises rollout would not be completed.
“We’ve now agreed on a multi-technology mode, where we will seek to use existing copper network where we can,” he said.
That is so full of shit, no way that median figure for my area is close to true.